Thursday 18 October 2018
Contact US    |    Archive
sputniknews.com
3 months ago

Long Story: Spain s New Sub Won t Fit in Its Dock Due to Engineering Error

The new S-80 Plus-class submarine, a €4 billion ($4.6 billion) program expected to supply Madrid with a new generation of diesel-electric subs, has hit a major snag. Once calculated to be too heavy to float, the foot sub is now said to be too long for the

Read on the original site


هذه الصفحة هي مجرد قاریء تلقائي للأخبار باستخدام خدمة الـ RSS و بأن نشر هذه الأخبار هنا لاتعني تأییدها علی الإطلاق.
Hashtags:   

Long

 | 

Story

 | 

Spain

 | 

New

 | 

Sub

 | 

Won

 | 

Fit

 | 

Its

 | 

Dock

 | 

Due

 | 

Engineering

 | 

Error

 | 
Most Popular (6 hours)

Most Popular (24 hours)

Most Popular (a week)

Morgan St.

- foxsports.com